{"id":77003,"date":"2026-05-11T05:01:13","date_gmt":"2026-05-11T05:01:13","guid":{"rendered":"https:\/\/ciaoup.it\/?p=77003"},"modified":"2026-05-11T05:01:13","modified_gmt":"2026-05-11T05:01:13","slug":"powerx-signs-mou-with-montenegros-national-utility-epcg-for-strategic-cooperation-on-battery-energy-storage","status":"publish","type":"post","link":"https:\/\/ciaoup.it\/?p=77003","title":{"rendered":"PowerX Signs MOU with Montenegro&#8217;s National Utility EPCG for Strategic Cooperation on Battery Energy Storage"},"content":{"rendered":"<p>COMUNICATO STAMPA &#8211; CONTENUTO PROMOZIONALE<\/p>\n<p> TOKYO, May 11, 2026 \/PRNewswire\/ &#8212; PowerX, Inc.(Head Office: Tamano City, Okayama Prefecture; Director, President and CEO: Masahiro Ito; Securities Code: 485A) signed a Memorandum of Understanding (MOU) on May 7th with\u00a0Elektroprivreda Crne Gore AD Nik\u0161i\u0107 (EPCG), Montenegro&#8217;s national electricity utility, regarding the Strategic Cooperation on\u00a0 Battery Energy Storage Systems (BESS).\u00a0<\/p>\n<p>The MOU sets an indicative target of approximately 500 MWh of BESS capacity over an initial three-year period to support the large-scale integration of renewable energy and strengthen grid stability in Montenegro.\u00a0<\/p>\n<p>Montenegro adopted its National Energy and Climate Plan in December 2025, setting 2030 targets that include a minimum 50% share of renewable energy in gross final energy consumption. EPCG, the country&#8217;s largest electricity producer, has identified BESS as a key component of its grid modernization and renewable energy integration efforts.\u00a0<\/p>\n<p>Under the MOU, the parties will collaborate together to identify optimal BESS deployment plans to support grid reliability, peak shaving, and frequency regulation, with comprehensive after-sales support. PowerX will also explore the potential establishment of local BESS assembly capabilities in Montenegro.\u00a0<\/p>\n<p>Montenegro&#8217;s EU candidate status, coupled with its power interconnection with Italy, makes the country a strategically important market for clean energy infrastructure in Europe. PowerX aims to leverage this cooperation as a foundation for expanding its BESS business into the European market.\u00a0<\/p>\n<p>&#8220;Battery energy storage systems are becoming a core part of modern energy infrastructure, enabling greater integration of renewable energy while supporting grid stability, flexibility, and resilience,&#8221; said Masahiro Ito, CEO of PowerX. &#8220;As Japan&#8217;s leading BESS provider, PowerX is pleased to partner with EPCG to support Montenegro&#8217;s energy transition and the modernization of its power system. Through this strategic cooperation, we aim not only to deploy advanced battery storage solutions, but also to build a long-term foundation for PowerX&#8217;s activities in Montenegro and the wider region, including the development of local battery system assembly capabilities.&#8221;\u00a0<\/p>\n<p>&#8220;This partnership represents an important step in the modernization of our power system and further confirms EPCG&#8217;s commitment to an energy transition based on innovation and sustainability,&#8221; said Zdravko Draga\u0161, CEO of EPCG. &#8220;Cooperation with PowerX gives us access to advanced energy storage technologies, which are essential for the stable integration of renewable energy sources and the long-term energy security of Montenegro.&#8221;\u00a0<\/p>\n<p>About PowerX, Inc.PowerX is a Japanese energy storage company listed on the Tokyo Stock Exchange Growth Market. Headquartered in Tamano City, Okayama Prefecture, with offices and an R&amp;D center in Tokyo, PowerX&#8217;s core business spans the development and manufacture of battery energy storage systems (BESS), scalable modular data centers, and battery-buffered EV charging systems, as well as the development and operation of grid-scale battery farms. To date, its BESS has been selected for 153 project sites in Japan, with a cumulative adopted capacity of 2.8 GWh.\u00a0<\/p>\n<p>For more information, visit https:\/\/power-x.jp\/<br \/>\n\u00a0<\/p>\n<p>About Elektroprivreda Crne Gore (EPCG)Elektroprivreda Crne Gore AD Nik\u0161i\u0107 (EPCG) is Montenegro&#8217;s national electricity utility, responsible for generating, transmitting, distributing, and supplying the majority of the country&#8217;s electrical power. With around 874 MW of installed capacity\u2014including major hydropower plants, a key thermal power facility, and an expanding portfolio of wind and solar projects\u2014EPCG plays a central role in Montenegro&#8217;s energy transition.\u00a0<\/p>\n<p>For more information, visit https:\/\/www.epcg.com\/<br \/>\n\u00a0<\/p>\n<p>Media Contact:PowerX, Inc. \u2014 Corporate CommunicationsEmail:\u00a0pr@power-x.jp<br \/>\n\u00a0<\/p>\n<p>\u00a0\u00a0<\/p>\n<p> View original content:https:\/\/www.prnewswire.co.uk\/news-releases\/powerx-signs-mou-with-montenegros-national-utility-epcg-for-strategic-cooperation-on-battery-energy-storage-302767516.html<br \/>\n\u00a0<\/p>\n<p>Copyright 2026 PR Newswire. All Rights Reserved.\u00a0<\/p>\n<p>COMUNICATO STAMPA &#8211; CONTENUTO PROMOZIONALE: Immediapress &#232; un servizio di diffusione di comunicati stampa in testo originale redatto direttamente dall&#8217;ente che lo emette. L&#8217;Adnkronos e Immediapress non sono responsabili per i contenuti dei comunicati trasmessi<\/p>\n<p>&#8212;<\/p>\n<p>immediapress\/pr-newswire<\/p><\/p>\n<div style=\"display:flex; gap:10px;justify-content:center\" class=\"wps-pgfw-pdf-generate-icon__wrapper-frontend\">\n\t\t<a  href=\"https:\/\/ciaoup.it?action=genpdf&amp;id=77003\" class=\"pgfw-single-pdf-download-button\" ><img src=\"https:\/\/ciaoup.it\/wp-content\/plugins\/pdf-generator-for-wp\/admin\/src\/images\/PDF_Tray.svg\" title=\"Generate PDF\" style=\"width:auto; height:45px;\"><\/a>\n\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>COMUNICATO STAMPA &#8211; CONTENUTO PROMOZIONALE TOKYO, May 11, 2026 \/PRNewswire\/ &#8212; PowerX, Inc.(Head Office: Tamano&hellip;<\/p>\n","protected":false},"author":3,"featured_media":77004,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[23],"class_list":["post-77003","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-comunicati","tag-immediapress"],"_links":{"self":[{"href":"https:\/\/ciaoup.it\/index.php?rest_route=\/wp\/v2\/posts\/77003","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ciaoup.it\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ciaoup.it\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ciaoup.it\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ciaoup.it\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=77003"}],"version-history":[{"count":1,"href":"https:\/\/ciaoup.it\/index.php?rest_route=\/wp\/v2\/posts\/77003\/revisions"}],"predecessor-version":[{"id":77005,"href":"https:\/\/ciaoup.it\/index.php?rest_route=\/wp\/v2\/posts\/77003\/revisions\/77005"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ciaoup.it\/index.php?rest_route=\/wp\/v2\/media\/77004"}],"wp:attachment":[{"href":"https:\/\/ciaoup.it\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=77003"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ciaoup.it\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=77003"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ciaoup.it\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=77003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}